Add product quality gates and milestone acceptance
This commit is contained in:
+15
-4
@@ -20,6 +20,11 @@ The skill is a **capability, not a mandatory process**. Apply the lightest mode
|
||||
|
||||
Do not force task cards, waves or `.swarm/` artifacts onto a small request. Conversely, do not skip independent verification on a large or risky one. The user keeps the choice of stack, scope and pace; the skill only adds coordination when breadth or risk justifies it.
|
||||
|
||||
**Process is optional; quality gates are not.** For anything the user will actually use, read
|
||||
`references/product-quality.md` and agree on a **prototype** or **product** profile. Product work
|
||||
requires a release-build performance check, a real UX scenario, baseline comparison and an explicit
|
||||
user verdict. A verifier's `pass` is technical evidence, not product acceptance.
|
||||
|
||||
## Fit check — before spawning anything
|
||||
|
||||
Swarm only when all are true:
|
||||
@@ -27,6 +32,8 @@ Swarm only when all are true:
|
||||
- Each unit has a **re-runnable acceptance check**: a command, a named artifact, a source/citation check, a metric, or a rendered result. There is no universal evidence type; match it to the domain adapter.
|
||||
- Wall-clock is dominated by **breadth**, not by one deep sequential chain.
|
||||
- You can state the interfaces between units **before** dispatch.
|
||||
- The units do **not** share one visual language or one screen. UI coherence is usually a single-owner
|
||||
job; parallel panel writers produce a Frankenstein interface.
|
||||
|
||||
Otherwise: one agent for small work; 2–5 `subagent` calls for a few long-lived roles you need to steer. Never swarm one bug, one design decision, or work where every unit edits the same files.
|
||||
|
||||
@@ -43,12 +50,13 @@ Otherwise: one agent for small work; 2–5 `subagent` calls for a few long-lived
|
||||
0. **Fit check & prerequisite gate** — go/no-go, budget (`max_agents`, `max_waves`, **tokens**), and **discover the available tools and real active-child cap** before sizing a wave. Check every required toolchain/runtime/service/display/credential with a real command; record the result in `.swarm/prerequisites.md` and `state.json`. Prefer project-local pinned setup; **never install globally/system-wide or run `sudo`/`curl | sh` without explicit user approval**. If a required prerequisite is missing and cannot be resolved safely, ask the user with the exact item, command, scope and alternatives **before any worker starts**. Workers never install; they return `blocked`.
|
||||
1. **Resolve prerequisites** — after approval/install, re-run the checks and the baseline suite. No build or verify wave starts while a required item is `needs_user` or `blocked`; optional items may be skipped only with a recorded reduced scope. See `references/prerequisites.md`.
|
||||
2. **Recon** — 2–4 parallel agents return findings with paths and line numbers. Timebox them, merge into `.swarm/brief.md` and `.swarm/map.md`, then stop them; recon must not hold slots during the build wave.
|
||||
3. **Plan gate** — write `.swarm/plan.json`, `plan.md`, `ownership.md`, `contracts.md`, and one `tasks/Txx.md` per unit. Every success criterion maps to a task and a check. No two tasks write the same path. Include a `LEAD`/`INTEGRATOR` task owning lead-owned shared files, screenshots, licenses and the final report. Freeze interfaces. Prefer vertical slices and files under ~800 lines; a task that requires reading a 3k-line file is too broad. **Do not dispatch until this gate passes.**
|
||||
3. **Plan gate** — write `.swarm/plan.json`, `plan.md`, `ownership.md`, `contracts.md`, and one `tasks/Txx.md` per unit. Every success criterion maps to a task and a check. No two tasks write the same path. Include a `LEAD`/`INTEGRATOR` task owning lead-owned shared files, screenshots, licenses and the final report. Freeze interfaces. Prefer vertical slices and files under ~800 lines; a task that requires reading a 3k-line file is too broad. Record the **quality profile**, performance budget, baseline scenarios and user-acceptance owner. **Do not dispatch until this gate passes.**
|
||||
4. **Build wave** — one `workflow` call per build wave when the tool exists, using the batched runner in `assets/wave.workflow.js`; its `concurrency` must fit the available slots (see Sizing). If `workflow`/`subagent` is unavailable, the lead executes the same packets sequentially. Retry `null`/`failed` once; if the runtime reports an active-child limit, halve the next batch and dispatch the remaining tasks — never relaunch the same oversubscribed fan-out.
|
||||
5. **Audit** — run `scripts/audit-scope.mjs` from the skill base directory; revert or reassign out-of-scope changes. Run the build/test gate.
|
||||
6. **Verify wave** — **freeze source changes**, run automated gates first (compile/tests/artifact), then 4–6 fresh verifiers by risk cluster (or 1–2 for a small domain task). Use `assets/verdict.schema.json` and, when available, `assets/verify.workflow.js`; the review file on disk is the source of truth, not the workflow return. Verifiers never fix. Match evidence to the domain adapter: rerun commands, read rendered artifacts, sample citations, recompute metrics. For GUI products, use per-agent isolated displays, never a shared desktop (see `references/visual-testing.md`). If you fix findings, re-run only the affected **delta** and mark the old review stale.
|
||||
7. **Integrate** — one integrator for shared files and cross-cutting fixes; re-run the full acceptance suite; then a final verification pass on the integrated build.
|
||||
8. **Close** — freeze the build and run a final independent review against the original request (not the plan), then write `final-report.md`.
|
||||
7. **Product gate** — for product-profile work, measure the release build against the performance budget, run the real UX scenario, compare with the baseline, and get the user's explicit verdict. A technical verifier pass is not enough. If the product is slower or worse than the baseline, stop and fix the slice; do not start the next milestone. See `references/product-quality.md`.
|
||||
8. **Integrate** — one integrator for shared files and cross-cutting fixes; re-run the full acceptance suite; then a final verification pass on the integrated build.
|
||||
9. **Close** — freeze the build and run a final independent review against the original request (not the plan), then write `final-report.md`.
|
||||
|
||||
## Hard rules
|
||||
|
||||
@@ -62,7 +70,9 @@ Otherwise: one agent for small work; 2–5 `subagent` calls for a few long-lived
|
||||
8. **Stop rules.** Two waves with no net progress → stop and re-plan. Verification failure rate > 30% → fix briefs/contracts, not agent count. Budget exhausted → report partial and list unverified areas.
|
||||
9. **No shared visual desktop.** Visual agents get their own display/config/project copy; see `references/visual-testing.md`. A screenshot from a shared desktop is not evidence. Computer-use is a last-resort, single-agent tier on a disposable desktop/VM; it is never the sole evidence and never runs in parallel with other visual agents.
|
||||
10. **Prerequisites before dispatch.** A required tool/runtime/service/credential is checked, installed with explicit approval if needed, and re-checked before workers start. Ask the user before work if it cannot be resolved; never let a worker install or silently skip a required check.
|
||||
11. **Token budget is a quality constraint.** Record spend per phase, keep a 20–30% reserve for verification/integration, and stop at the hard cap with a partial report. Cut redundant context, agents, full-file reads and full re-reviews — never cut tests or independent review. See `references/token-economy.md`.
|
||||
11. **Token budget is a ceiling, not a target.** Record spend per phase, keep a 20–30% reserve for verification/integration/**polish**, and do not stop a product task at the soft cap if the quality gate is unmet; stop at the hard cap or when the gate is met. Cut redundant context, agents, full-file reads and full re-reviews — never cut tests, independent review or user-driven fixes. See `references/token-economy.md`.
|
||||
12. **A technical pass is not product acceptance.** Product-profile work needs measured performance, a real UX scenario, baseline comparison and an explicit user verdict; otherwise the product gate is `not_run`. See `references/product-quality.md`.
|
||||
13. **One milestone at a time.** Do not start M1/M2 while M0 is still laggy, visually rough or explicitly “not usable”. Scope adds must wait for acceptance.
|
||||
|
||||
## Sizing
|
||||
|
||||
@@ -114,6 +124,7 @@ For a `blocked` task: apply the smallest contract/shared-file change, update `co
|
||||
- `references/token-economy.md` — measurement, budgets, context discipline, delta verification, vertical slices.
|
||||
- `references/prerequisites.md` — preflight checks, install/approval policy, degraded-scope record.
|
||||
- `references/visual-testing.md` — isolated Xvfb/container visual tests, deterministic screenshots, verifier procedure (GUI adapter).
|
||||
- `references/product-quality.md` — prototype/product profiles, performance and UX gates, baseline comparison, human acceptance.
|
||||
- `assets/` — copyable brief, task, and verifier templates; `report.schema.json`, `verdict.schema.json`; `wave.workflow.js` (batched workers), `verify.workflow.js` (frozen verification).
|
||||
- `scripts/audit-scope.mjs` — compares changed files to the ownership map.
|
||||
|
||||
|
||||