6.1 KiB
6.1 KiB
name, description, whenToUse
| name | description | whenToUse |
|---|---|---|
| agent-swarm | Use when a large task splits into 8+ independent units, or when a risky deliverable needs an independent critic across software, research, content, data, design or operations. Not for small, sequential or tightly coupled work. | The task is broad or risky enough that parallel workers or a fresh verifier change the outcome; one agent would take hours and the units can be described without stepping on each other. |
Agent Swarm
A small orchestration core, not a mandatory methodology. Use the lightest mode that meets the risk; the user keeps the stack, scope and pace.
Choose the mode
| Mode | Use when | What it adds |
|---|---|---|
| Direct | one unit, fast feedback, low blast radius | nothing |
| Paired critic | medium task, design decision, risky change | one independent review |
| Swarm | 8+ independent units or breadth dominates | ownership, parallel workers, verifier |
If the units share one screen, one design language or one mutable artifact, do not swarm. Use one implementer and one critic; parallel panel writers produce incoherent UI.
Invariants
- Outcome before process. Agree on what “done” means and how it will be checked. Do not create
.swarm/files, task cards or reports just to look organized. - One owner per artifact. In a swarm, every path/artifact belongs to one writer. Shared files and contracts belong to the lead/integrator.
- Packets, not transcripts. A worker gets a self-contained brief, its scope, the contract and the acceptance checks — never the lead's full conversation.
- Independent verification. The author does not verify their own work. A fresh context checks the artifact, not the worker's summary. Verification is required for risky or product work; a trivial direct change may only need a command and a read-back.
- Evidence before claims. “Done” means a runnable artifact, a passing command, a citation, a metric or a rendered result — not a confident sentence.
- A technical pass is not product acceptance. For product/UI work, measure the release build,
run a real scenario, compare with the baseline and get the user's verdict. If performance/UX was
not measured, the product gate is
not_run, notpass. - Do not add features to hide bad quality. If it is laggy, visually worse or harder to use than the baseline, fix the slice before expanding scope.
- One milestone at a time. For product work, do not start M1/M2 while M0 is still rough or explicitly “not usable”.
- Safety. Check prerequisites before work; ask before global installs, destructive actions, deployments or irreversible changes. Workers never install or touch live systems.
- User overrides. Direct user instructions beat this skill. If the user asks for speed, a prototype or “just do it”, drop the ceremony — keep only the safety and evidence that still matter.
Loop
- Understand the outcome, audience, quality bar and constraints. Ask only when the answer changes the result.
- Check the environment: toolchain, commands, services, display, credentials. If a required item is missing and cannot be resolved safely, ask before starting.
- Plan only as much as the risk requires. For a swarm, write a one-page brief, disjoint scopes, frozen contracts and acceptance checks. For direct/paired work, skip the ceremony.
- Work. Direct, paired or batched workers. Keep files small enough that each worker reads only what it needs; use available concurrency, not a fixed wave number.
- Verify. Technical checks first, then a fresh critic. For product work, add release performance, UX scenario, baseline comparison and the user's explicit verdict.
- Accept and integrate. The lead owns shared files, final checks and the report. No next milestone without acceptance (or an explicit waiver).
If you swarm
Optional, for resumability and coordination — not a requirement for every task:
.swarm/brief.md— goal, quality bar, commands, conventions, hazards;.swarm/contracts.md— only interfaces that cross a task boundary;.swarm/tasks/Txx.md— one page per unit;.swarm/reports/Txx.json— structured evidence, if the lead needs to triage many workers;.swarm/reviews/Vxx.md— independent verdict and findings.
Use the batched runner in assets/wave.workflow.js when workflow exists; otherwise use subagent
or direct sequential work. Never relaunch an oversubscribed fan-out. Read references/playbook.md
for the detailed runbook, references/packets.md for cards and references/orchestration.md for
tool specifics — only when the task needs them.
Optional modules
Read only what applies:
references/playbook.md— detailed swarm runbook, gates, recovery.references/packets.md— brief/task/verifier templates and examples.references/orchestration.md—workflowpatterns, retries, batching.references/domains.md— software, research, content, data, design, operations.references/prerequisites.md— preflight, install/approval policy.references/token-economy.md— budgets, context discipline, delta review.references/visual-testing.md— isolated displays, screenshots, computer-use limits.references/product-quality.md— performance/UX/baseline/human acceptance.evals/— how to test this skill itself (baseline vs with-skill, trigger checks).
Signals
- Workers ask the same question or edit the same file → the plan or contracts are underspecified.
- Reports are long on prose and short on evidence → the task card lacks a check.
- The lead reads more tokens than the workers produce → waves or reports are too large.
- The same defect repeats → fix the brief, not the worker count.
- The product compiles and passes tests but feels worse than the previous version → stop adding features and run the product gate.
- You are creating process artifacts that nobody will read → delete them and do the work.
- You are changing this skill without evidence → run
evals/README.mdagainst a no-skill baseline; keep the change only if it improves quality/time without over-orchestration.