# Product quality gates
|
||
|
||
Functional correctness is necessary, not sufficient. A build can compile, pass tests and produce a
|
||
screenshot while still being too slow, visually incoherent or unpleasant to use. Do not let
|
||
`pass` on technical acceptance stand in for product acceptance.
|
||
|
||
## Prototype vs product
|
||
|
||
Choose the quality profile with the user before dispatch:
|
||
|
||
| Profile | Use when | Mandatory gates |
|
||
|---|---|---|
|
||
| **Prototype** | the user explicitly wants a rough idea, spike or throwaway demo | runnable artifact, honest limits, no performance promise |
|
||
| **Product** | the artifact will be used, shipped, demoed to others or compared with an existing version | functional + performance + UX/visual + baseline + human acceptance |
|
||
|
||
Do not silently treat a prototype as a product. Do not demand product polish for a disposable spike.
|
||
State the profile in the brief.
|
||
|
||
## Gates
|
||
|
||
### 1. Functional
|
||
|
||
- acceptance commands and edge cases pass;
|
||
- the artifact runs, not just compiles;
|
||
- the verifier can reproduce the checks;
|
||
- no known crash/data-loss path.
|
||
|
||
### 2. Performance
|
||
|
||
Performance is part of correctness for interactive products. Define a budget in the brief before
|
||
code, measure it on a **release/optimized** build, and record the environment.
|
||
|
||
Suggested starting points (adjust to the product, do not treat as universal):
|
||
|
||
- p95 frame time at the target window size: **≤16.7 ms** for 60 FPS, or a documented lower target;
|
||
- input-to-visible response: **≤50 ms** for click/selection, **≤100 ms** for heavier actions;
|
||
- startup to usable UI: **≤2 s** for a local desktop editor;
|
||
- idle CPU and memory recorded; no runaway process when idle;
|
||
- test with a realistic scene, not only an empty one (e.g. 100/1 000 entities).
|
||
|
||
Measure with a frame-time diagnostic/overlay, a scripted interaction, or an external profiler.
|
||
Record p50/p95, resolution, GPU/CPU, build profile and commit. **Debug builds are not evidence of
|
||
release performance**; if only debug is available, report the numbers as provisional and do not claim
|
||
the budget is met.
|
||
|
||
If the budget is not met: reduce scope or fix the hot path before adding features. Do not hide a
|
||
frame-time regression behind more UI.
|
||
|
||
### 3. UX / visual
|
||
|
||
For GUI and visual work:
|
||
|
||
- run a real 5-minute task, not just a screenshot;
|
||
- check hierarchy, typography, spacing, contrast, focus, hover/active/disabled states;
|
||
- check default, minimum and error/empty states;
|
||
- check that the viewport is not blocked by panels and that resizing does not clip controls;
|
||
- compare with the existing version/baseline on the same scenarios;
|
||
- capture artifacts and record the exact commands.
|
||
|
||
“Looks fine” is not a verdict. Name what is readable, reachable, clipped or missing.
|
||
|
||
### 4. Baseline
|
||
|
||
If a previous version exists, define the scenarios where the new version must be **no worse**:
|
||
startup, time to first edit, selection, drag, save, visual density. A regression against the baseline
|
||
is a failure even if the new implementation has more features.
|
||
|
||
### 5. Human acceptance
|
||
|
||
A verifier can check evidence; it cannot decide that the product feels usable. After each milestone
|
||
or vertical slice:
|
||
|
||
1. the lead gives the user a short runnable artifact and a 3–5 step scenario;
|
||
2. the user runs it and answers: usable / usable with issues / not usable;
|
||
3. issues become the next milestone, not a footnote in a report;
|
||
4. **do not start the next milestone until the current one is accepted** (or explicitly waived).
|
||
|
||
Record the verdict in `state.json`/`final-report.md`. A detached verifier `pass` is not a substitute.
|
||
|
||
### 6. Scope
|
||
|
||
One milestone per session. Do not implement M1/M2 while M0 is still unpleasant. If the current slice is
|
||
not usable, adding assets, play mode or export will not fix it.
|
||
|
||
## Stop rules
|
||
|
||
Stop and re-plan when any of these is true:
|
||
|
||
- functional acceptance passes but the product is visibly slower or worse than the baseline;
|
||
- performance was not measured on an optimized build for a product task;
|
||
- the user says “not usable” and the next step is more features instead of fixing the current slice;
|
||
- the work has consumed half the milestone budget/time without a runnable artifact;
|
||
- a UI slice has multiple parallel writers and the visual language is drifting;
|
||
- the verifier can only produce a `pass` by ignoring performance/UX.
|
||
|
||
## Minimal product gate
|
||
|
||
> Release build, measured p95 frame time and input latency, 5-minute real scenario, baseline
|
||
> comparison, explicit user verdict. If any is missing, the product gate is `not_run`, not `pass`.
|